


| Pictures of Bathrooms |











| From Laundry To Full Bathroom: This laundry room was completely gutted, walls reconstructed for tub/shower insert, sink fixture and cabinet installed, toilet installed, walls painted and ceramic tile flooring installed. |
| Master Bathroom: This master bathroom was completely remodeled. Shower, tub, toilet and flooring removed and one wall was relocated to enlarge the room. The original contract called for a simple basic bath tub with a separate shower insert with a seat. As you can see in the pictures below, by the end of the job the bathtub became a jacuzzi tub with a custom built frame & step and the shower is now a custom built shower with a bench seat completely covered with ceramic tile from floor to ceiling. Walls are 1/2 ceramic tile and 1/2 paint, flooring is ceramic tile. |



| H and A Concepts |
| for ALL your Home Repair & Remodeling needs! |


Picture Gallery Hours of Operation Mon - Fri 8 am - 6 pm |


| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| H & A Concepts P. O. Box 244 Avant, OK 74001 (918) 263-1071 |